Timezone as Strategy: Reframing the US-Asia Work Cycle for Global Delivery
- Ojash Shrestha
- Aug 28
- 3 min read
How time zones can be used as a continuous delivery advantage, not a burden.

When most people think of working across US–Asia time zones, they picture the burden: late-night calls, delayed responses, and the friction of collaboration across continents.
But after more than two decades leading teams across the US, Europe and Asia, I see it differently. Time zones aren’t a hurdle. They’re a strategy.
The Myth of the “Timezone Problem” in Distributed Teams
Too often, companies frame time zones as a loss:
“We can’t get answers right away.”
“We’re always waiting on each other.”
“It slows us down.”
That framing is backwards. What if, instead of treating the 6-to-12-hour difference as a delay, you treat it as a handoff window?
Continuous Delivery by Design

Think of it this way: the US team wraps up the day with a solid base of progress. As they sign off, the Asia team picks up the baton, building on the foundation already in place. While the US team rests, the Asia team drives execution forward and refines solutions. By the time the US team is back online, fresh progress and improvements await them.
This cycle creates what I call 24-hour continuity. Problems don’t sit idle overnight, they move forward. Deadlines don’t stretch, they compress. Instead of “losing” time, you’re actually doubling it. That’s the power of a global delivery strategy in building cross-border tech partnerships that last.
Why Most Teams Miss This Opportunity
Here’s the catch: this only works when teams are aligned, not just in hours but in ownership and trust.
If requirements are vague, work stalls overnight.
If communication is weak, the timezone gap becomes real.
If there’s no cultural bridge, handoffs are clunky.
The timezone itself isn’t the challenge, the system around it is. This is where building on principles from The Enduring Bridge: trust, resilience, and strategic depth, creates a foundation for success.
Building the Timezone Advantage into Your Global Delivery Strategy
Here are a few principles we use with our clients and teams:
Plan in Cycles, Not Days Stop saying, “We’ll get it tomorrow.” Start saying, “It’ll be ready in the next cycle.” That shift builds rhythm.
Write It Down Documentation is oxygen. A clearly written requirement, update, or bug report eliminates late-night confusion.
Handoff Discipline Every “end of day” update should be a “start of day” asset for the other side. Think of it as a baton, not a burden.
Timezone Anchors
Instead of forcing everyone into awkward overlap hours, define anchors: the one or two windows a week where real-time sync is non-negotiable.
The Bigger Picture
When you embrace timezone as a global delivery strategy, you don’t just solve a scheduling problem. You unlock:
Faster delivery cycles
More resilient systems (no idle downtime)
Stronger global culture (teams see themselves as partners, not satellites)
It reframes offshore not as a compromise but as a multiplier.
Final Thought
Global collaboration was never meant to be a copy-paste of in-house work hours. It’s meant to be a new rhythm.
The US–Asia work cycle, when reframed, is not about what you lose, it’s about what you gain: continuity, speed, and strategic advantage.
Timezone isn’t a problem. It’s a playbook.
About the Author

Ojash Shrestha
President | Novelty Technology
Connect with Ojash on LinkedIn.